This is the mail archive of the
glibc-bugs@sourceware.org
mailing list for the glibc project.
[Bug localedata/10011] New: wrong week/first_weekday/first_workday for de_AT locale
- From: "flyer dot REMOVE dot SPAM at gSmPaAiMl dot com" <sourceware-bugzilla at sourceware dot org>
- To: glibc-bugs at sources dot redhat dot com
- Date: 29 Mar 2009 20:00:35 -0000
- Subject: [Bug localedata/10011] New: wrong week/first_weekday/first_workday for de_AT locale
- Reply-to: sourceware-bugzilla at sourceware dot org
In Austria calendars show weeks staring in Mondays. As the de_AT locale's "day"
entry starts lists Monday on the second position, "first_weekday" should be set
to "2".
Accordingly, Mondays are the first workdays of a week. Hence de_AT's
"first_workday" should be set to "2".
--
Summary: wrong week/first_weekday/first_workday for de_AT locale
Product: glibc
Version: unspecified
Status: NEW
Severity: normal
Priority: P2
Component: localedata
AssignedTo: libc-locales at sources dot redhat dot com
ReportedBy: flyer dot REMOVE dot SPAM at gSmPaAiMl dot com
CC: glibc-bugs at sources dot redhat dot com
GCC build triplet: x86_64-pc-linux-gnu
GCC host triplet: x86_64-pc-linux-gnu
GCC target triplet: x86_64-pc-linux-gnu
http://sourceware.org/bugzilla/show_bug.cgi?id=10011
------- You are receiving this mail because: -------
You are on the CC list for the bug, or are watching someone who is.